Project Management SOP Process

Zhijia project management follows the principles of standardization and refinement, and builds 8 core processes around the whole life cycle of automotive hardware molds.

To ensure the efficient landing of the project, quality standards, delivery on time, all-round protection of customer demand.

Order Review
01
致嘉模具 - 订单评审
01

Order Review

After receiving the customer's order, multi-department collaborative review, focusing on the investigation of capacity risks, technical risks, synchronous organization of team review, a comprehensive assessment of the feasibility of the order, after confirmation of the formal project.
Engineering Design
02
致嘉模具 - 工程设计
02

Engineering Design

The technical team carries out CAE analysis, organizes discussions on material belt and mold structure, and uses professional software to complete the design to ensure that the scheme is scientifically suitable for production.
Machining
03
致嘉模具 - 机加工
03

Machining

According to the bill of materials, tolerance drawings and 2D drawings, relying on high-end equipment to accurately process raw materials, strictly control the accuracy and process standards of each process.
Assembly & Commissioning
04
致嘉模具 - 组装&调试
04

Assembly & Commissioning

Standardize the assembly and processing of parts, through 3D laser auxiliary debugging, issue debugging report, synchronous technical review, to ensure the smooth operation of the mold standard.
Quality inspection
05
致嘉模具 - 质量检测
05

Quality inspection

With the help of inspection tools and CMM testing equipment, comprehensive testing is carried out against standards, CMM reports are issued, and unqualified products are prevented from flowing into the next link.
Acceptance inspection
06
致嘉模具 - 验收
06

Acceptance inspection

Organize customers to carry out acceptance work, provide checklists, acceptance reports and other relevant information, cooperate with customers to check indicators, and sign acceptance documents after confirmation.
Shipment
07
致嘉模具 - 出货
07

Shipment

After acceptance, the mold shall be protected and packaged according to the packaging standards, the shipping address shall be confirmed, and the logistics arrangement shall be coordinated to ensure the safe and timely delivery of the mold.
Busbar Commissioning
08
致嘉模具 - 母线调试
08

Busbar Commissioning

After the mold is delivered, arrange fitters and project engineers to attend the customer's factory to assist in completing the bus debugging, guide the customer's operation and provide after-sales technical support.